1. Maximum 3 persons per team. 
2. The maximum dimensions for cooling tower are 30cms*30cms*30cms. 
3. NO RESTRICTION in usage of material for construction. 
4. Quantity of water to be cooled is 750ml.
5. Minimum collection of water at the end of run is 200ml.
6. Residence time in tower is 240 sec.
7. There must be an outlet for drainage/collection.
8. No direct addition of cooling chemicals.

9. Judges decision will be final